Dr. Phillips Orlando Center for Performing Arts, Orlando, Florida New world-class state-of-the-art center including three performance halls (a 2,800-seat amplified theater, an 1,800-seat acoustic theater and a 300-seat theater), an outdoor plaza and performance space, rehearsal rooms, administrative offices and educational programming space. Built on a public courtyard suitable for concerts and shows and surrounded by up to two million square feet of private development. 330,000 sf
American Airlines San Juan Hub Terminal Expansion, San Juan, Puerto Rico 800,000 sq. ft. terminal expansion includes three story Federal Inspection Station 8-gate, 3-story airside terminal building Major renovations to existing 40-year old airport structures
Orlando International Airport, Orlando, Florida 1.2 million sq.ft post-tensioned parking garage 500 room, post-tensioned flat slab Hyatt Regency Hotel 500,000 sq.ft. composite steel Flight Center for Delta Airlines 140 ft. clearspan domed roof skylight structure 280 ft. structural steel truss, automobile connector bridge.
Georgia Military Academy Basketball Arena, Milledgeville, Georgia Steel framed concrete upper story on reinforced concrete lower level with basketball court, running track, weight room and curved roof trusses.
Turner Chapel AME Church, Marietta, Georgia 3,000 seat auditorium, 95,000 sq.ft. church 80 ft. high concrete walls with 200ft. clearspan steel roof trusses
Seymour Johnson AFB Clinic, Goldsboro, North Carolina Design/Build delivery of a new, two-story clinic facility that included a fabric roof over the Medical Mall Atrium and structural design to resist wind, seismic and Anti-Terrorist/Force Protection design loads.
Fort Valley Basketball Arena, Natatorium Complex, Fort Valley, Georgia 1400 seat Basketball Arena Natatorium
Schwartz Center for the Performing Arts, Emory University, Atlanta, Georgia 800 Seat Concert Hall 70 ft span trusses over 800 Seat Concert Hall 500 tons of acoustical, pre-cast concrete hung from bottom of trusses Orchestra Rehearsal Hall, Dance Studio, Theater
Sidney & Berne Davis Arts Center, Ft. Myers, Florida Renovation and restoration of the former 1933 U.S. Post Office building into the arts center which has neoclassic style columns and walls made of Florida key limestone embedded with coral formations.
B-52 Two-bay Fuel Cell Maintenance Hangar, Barksdale Air Force Base, Shreveport, Louisiana 60,000 sq. ft. structural steel hangar for two B-52 bombers
U.S. Coastguard Base Expansion, Opa Locka, Florida. New Helicopter Hangar and maintenance shops Renovation of an Existing HU-25 Falcon Jet Hanger New Fuel Farm Facility.
B-52 Large Maintenance Hangar, Barksdale Air Force Base, Shreveport, Louisiana Schematic Design for 2-bay maintenance hangar
Beaufort Marine Air Corps Station Expansion, Beaufort, South Carolina Expansion of existing buildings and design of new hangars, training facilities, washracks and office facilities as part of the BRAC-III program
C-141 Empennage Enclosures, Robins AFB, Georgia 200 ft. steel truss and structural steel expansion of existing hangars
First Congregational Church, Atlanta, Georgia Preliminary investigation and schematic design for renovation, partial demolition and expansion of 1910 era historic church