American Airlines San Juan Hub Terminal Expansion, San Juan, Puerto Rico 800,000 sq. ft. terminal expansion includes three story Federal Inspection Station (FIS) 8-gate, 3-story airside terminal building Major renovations to existing 40-year old airport structures
Orlando International Airport, Orlando, Florida 1.2 million sq.ft post-tensioned parking garage 500 room, post-tensioned flat slab Hyatt Regency Hotel 500,000 sq.ft. composite steel Flight Center for Delta Airlines 140 ft. clearspan domed roof skylight structure 280 ft. structural steel truss, automobile connector bridge.
Allen Aircraft Hanger, Naples, Florida Group 2 hanger and offices for a Gulfstream jet aircraft with approximately 19,250 sf hanger bay and 2,000 sf office area
U.S. Coastguard Base Expansion, Opa Locka, Florida. New Helicopter Hangar and maintenance shops Renovation of an Existing HU-25 Falcon Jet Hanger New Fuel Farm Facility.
B-52 Flight Simulator Facility, Barksdale Air Force Base, Shreveport, Louisiana 2-story flight simulator facility
B-52 Two-bay Fuel Cell Maintenance Hangar, Barksdale Air Force Base, Shreveport, Louisiana 60,000 sq. ft. structural steel hangar for two B-52 bombers
B-52 Large Maintenance Hangar, Barksdale Air Force Base, Shreveport, Louisiana Schematic Design for 2-bay maintenance hangar
B-52 Hangar Door Catwalks, Barksdale Air Force Base, Shreveport, Louisiana Retrofitting catwalks to one new and one existing B-52 hangar
Beaufort Marine Air Corps Station Expansion, Beaufort, South Carolina Expansion of existing buildings and design of new hangars, training facilities, washracks and office facilities as part of the BRAC-III program
Jacksonville Naval Air Station Expansion, Jacksonville, Florida Three phase expansion of the F-16 Naval Depot facilities including renovation of 1940's era buildings and construction of new facilities
C-141 Empennage Enclosures, Robins AFB, Georgia 200 ft. steel truss and structural steel expansion of existing hangars